According to the report of Rahdana information network; In a conversation with Asra Turk reporter, Toraj Zare, the CEO of Alumina Company of Iran, stated: Among the development projects, the construction of a special hydrate production unit with about 80% progress is currently being provided for a large part of parts and mechanical equipment. , electrical and precision tools have been done and most of the construction of non-operational buildings has also been finished.
He stated that the development plan of the profit and evaporation unit is about 77% progressed. He added: Now the pressure tanks of this unit are being painted. The flow diagram and the connection map of the new stage to the previous lines have been completed and communicated to the contractor for implementation.
The CEO of Iran Alumina Company, referring to 2 other development projects of this company, said: the progress of the bauxite processing plant construction project by heavy intermediary method has reached more than 50%, and in it, measures such as investigation and feasibility study of spiral design, concreting of the floor and reinforcement of the pool wall Water storage, concrete pouring of the roof of the electrical substation, folding of the heavy middle layer and reinforcement of the thickener floor have been done.
He pointed out that the second phase of the development of the red flower unit (installation of two thickeners) is about 48% progressed, and the welding, sandballast and painting of the pipework have been completed. Also, piping plans are prepared and raw materials are being purchased.